Building High-Level Commissioning and Commissioning Report In accordance with requirements of LEED,commissioning is run on heat ventilating and control system, lighting and control system, hot water system, and renewable energy sources system to make sure that they fully satisfy initially-designed indicators. A commissioning report required by LEED can be achieved through the process of appointment of experienced staff, confirmation of a design, commissioning procedures, and commissioning.

|